Microsoft Partner of the Year Finalist 2010
 
 

 

Manufacturing

For Your Complimentary
Assessment and Trial Version please
contact us through the short form below

Contact Us

Please contact us through the short form below.
Question or comment
First Name
Last Name
Company

Email

Phone
State/Provence
Industry



Important: We will never share your information with third parties.

 



 

Home -- Your Industry -- Manufacturing Solutions

ProModel Manufacturing Library

Audio Interviews

United Space Alliance
Radio Interview on "America's Business"


Product Summaries

ProModel
Process Simulator
Project Simulator
Portfolio Simulator


Project Reviews

A Leading Appliance Manufacturer:
Service level improvement through supply chain analysis.

American Express: Call Center Modeling

Boeing: Model allows high risk changes to be objectively evaluated without production interruption, helps convince management to implement recommended solution.

Chase Manhattan: Business Process and Service Level Improvement

Distribution Center Bottleneck Analysis and Throughput Improvement.

DuPont: Rail Transportation system design with simulation avoids $500,000 capital expense and only took 2 weeks.

Exxon Mobil: Simulation provided a better understand of a highly integrated system with complex interdependencies.

Fiat: Reduced WIP by 48% with simulation.

Fleet Boston: Optimizing Operations

Global Leader in the Design and Manufacture of Floors, Ceilings and Cabinets:
Cost reduction, throughput increase and capital justification.

Global supplier of industrial and consumer packaging products and services: Throughput Improvement/Capacity Increase and Cost Reduction via Improved Production and Warehousing Layout

A High Tech Leader in Engineering and Manufacturing:
Boiler Control Manufacturing Lean Process Improvement

Major Innovator in the Oil Drilling Industry:
New plant layout – New product introduction.

Major U.S. Appliance Manufacturer:
Lean analysis for appliance assembly throughput.

Pillowtex Corporation:
Plant consolidation and manufacturing optimization.

Teradyne:
Simulation for new product introduction and strategic decision making.

United Space Alliance:
Lean Six Sigma Analysis to Improve Flight Crew equipment Discrepancy Report process

United Space Alliance:
Lean Six Sigma to Improve United Space Alliance solid rocket booster element documentation scanning

United Space Alliance:
Lean Six Sigma Analysis to Improve Space Shuttle Orbiter tile removal and replacement process

UTC - Carrier Corporation: HVAC paint line cost avoidance and capital equipment justification.

Volkswagen: Logistics system improvement saved $20 million.

Wright Brand Foods: Doubled production capacity and saved more than $10 million.


Value Propositions

ProModel for Manufacturing

Simulation Enhances Six Sigma

Simulation for the Lean Enterprise


Videos

Distribution Center Bottleneck Analysis and Throughput Improvement Click here to see a customer interview video

Global supplier of industrial and consumer packaging products and services: Throughput Improvement/Capacity Increase and Cost Reduction via Improved Production and Warehousing Layout Click here to see a customer interview video

A High Tech Leader in Engineering and Manufacturing:
Boiler Control Manufacturing Lean Process Improvement Click here to see a customer interview video

ProModel Corporate Overview  Click here to see a customer interview video

Process Simulator Product Overview  Click here to see a customer interview video

Process Simulator: Lean Office Transformation Click here to see a customer interview video

Portfolio Simulator: The Role of Simulation in Strategic Planning Click here to see a customer interview video

Praxair  Click here to see a customer interview video

United Space Alliance:
Lean Six Sigma Analysis to Improve Flight Crew equipment Discrepancy Report process Click here to see a customer interview video

United Space Alliance:
Lean Six Sigma to Improve United Space Alliance solid rocket booster element documentation scanning Click here to see a customer interview video

United Space Alliance:
Lean Six Sigma Analysis to Improve Space Shuttle Orbiter tile removal and replacement process Click here to see a customer interview video

10 Year Journey of Implementing Simulation into a customers culture Video File

Strategic Portfolio Planning to Process Analysis 1 of 2 Video File

Strategic Portfolio Planning to Process Analysis 2 of 2 Video File

ProModel Customer Testimonial -Chemical Mfg -
Customer Service Among the Best
Video File


Webinars

Webinar Home Page


White Papers

Lean Simulation white paper by Dr. Charles Harrell (Form required)

The Role of Simulation in Strategic Planning (Form required)

Six Sigma and Simulation – Complementary Solutions


Contact us to discuss how we can help change your manufacturing future.

Manufacturing Events
 
WSC 2010
Baltimore, MD
Sunday, December 05, 2010 -
Wednesday, December 08, 2010
Visit site
 

10 Year Journey of Implementing Simulation into a customers culture Video File


View a Simulation

Please click on the image above to view an example model of ProModel Lean Manufacturing Simulation.


Sales: (800) 719-4972 • Training Services: (888) 700-7060  • Customer Support: (888) 776-6633
Fax: (801) 226-6046


Microsoft Partner of the Year 2009   Microsoft Partner of the Year Finalist 2010

© 1996-2010 ProModel Corporation. All Rights Reserved.